Preparations for the next autumn-winter period began immediately after the end of the previous autumn-winter period.
Having analyzed the operation of heat source and heat-using equipment, the company's dedicated experts developed and approved plans for organizational and technical measures, and created commissions to study the readiness of each facility. The commissions included specialists from Belarusian NPP and the State Energy and Gas Supervision Authority.
In 2024, 76 facilities were included in the volume of the thermal energy consumer readiness passport.
In preparation for the next autumn-winter period, the condition of heat engineering and electrical equipment, instrumentation and automation equipment of heat energy consumers and boiler houses was examined. Hydropneumatic flushing of heating systems of heat energy consumers was performed. Tests for hydraulic tightness of heating systems of heat energy consumers were made.
Metrological verification of measuring instruments of heat energy consumers and boiler houses was carried out, the heat-insulating layer and identification paint of pipelines of external and internal heat supply systems were restored, and other measures were taken.
The planned volume of work to prepare for the autumn-winter period was completed accurately and ahead of schedule.
All equipment of heat sources and consumers of thermal energy of Belarusian NPP is ready for operation in the autumn-winter period of 2024-2025.