Republican Unitary Enterprise

Belarusian nuclear
power plant

Address:

NPP construction site, 231201, Ostrovets, Grodno region. 

Е-mail: belaes@belaes.by

Phones:

Reception: +375 (1591) 4-53-59, fax: +375 (1591) 4-54-00

HR department: +375 (1591) 45-357; +375 (1591) 46-696

Accounts department: +375 (1591) 46-358

Monday, 25 April 2022

The first power unit of BelNPP was put into scheduled preventive maintenance

Written by Department of information and public relations

As previously reported, the relevant scheduled technological activity is carried out annually at nuclear power plants to ensure the stable operating condition of the equipment.

As part of the planned activity, the reactor plant equipment will be repaired, including steam generators, pressure compensator, main circulation pumps and a turbogenerator, as well as metal inspection and diagnostics of welded joints of the reactor equipment and pipelines of systems important for the safety of the power unit.

Partial refueling of fresh nuclear fuel into the reactor will be an important part of the activity ahead.

The first power unit of Belarusian nuclear power plant was put into commercial operation on June 10, 2021. Since its inclusion in the unified energy system (November 3, 2020), BelNPP has generated 9.3 billion kWh of electricity.

Last modified on Monday, 25 April 2022
© 2010- State enterprise «Belarusian NPP». All rights reserved. At any use of materials of the web-site, the active reference is obligatory on www.belaes.by.
The web-site operates error-checking system. If you find a mistake, highlight it and press Ctrl + Enter.
Яндекс.Метрика
Development of CVR-Oktjabr'skij
Send a mistake message