As part of the planned activity, the reactor plant equipment will be repaired, including steam generators, pressure compensator, main circulation pumps and a turbogenerator, as well as metal inspection and diagnostics of welded joints of the reactor equipment and pipelines of systems important for the safety of the power unit.
Partial refueling of fresh nuclear fuel into the reactor will be an important part of the activity ahead.
The first power unit of Belarusian nuclear power plant was put into commercial operation on June 10, 2021. Since its inclusion in the unified energy system (November 3, 2020), BelNPP has generated 9.3 billion kWh of electricity.